ABOUT THE SCHOOL

The proposed school would be located at Brize Meadow, to the east of Carterton, within a wider residential development. The site has been identified as suitable for a new primary school as part of the overall masterplan for the area.

01

LOCATION

02

CAPACITY

The school is planned as a 1 form entry (1FE) primary school, with one class per year group and a pupil admission number of 30 per year group.

03

LAYOUT

The site layout places the main school building to the south of the site, with playing fields positioned to the north. The surrounding area includes residential housing and local facilities such as a play park and small retail development.

04

FUTURE PROOFING

The site has also been assessed as being large enough to accommodate future expansion if required, ensuring flexibility to respond to longer-term demand.

The following provides a summary of the key factual details relating to the proposed new school, including site, capacity, and programme.

05

EXPECTED TIMELINE

The project is currently at feasibility and consultation stage. If approved, construction is anticipated to begin in 2027, with completion expected in 2028 ahead of a new academic year.